HOMEWORK ASSIGNMENT PRIOR
TO FIRST MEETING
Our objective is to lift perspective
from critiquing of the Jenzabar system and from the more routine data
processing that most extant ERP systems have learned to handle. College administrative staffs will identify
10 priority criteria and describe up to four important trends or newly
developing needs in their field and how an ERP system should support a
solution. Consultation outside the department is encouraged, as appropriate for
campus culture. A reporter will be designated to present a succinct summary at
the introductory meeting.
1.
End
users complete ÒAdministrative System CriteriaÓ form
a.
IS
Directors consolidate into Top 10 Criteria list
2.
Departments/functions
from each individual institution identify their departmentÕs ÒTrends, Needs,
WantsÓ as it relates to a new ERP system
a.
Record
on ÒBrainstorming Ð Departmental/Functional NeedsÓ form.
Departments should submit
electronic versions via the electronic documents provided Ð to facilitate ease
of copying and consolidating data as needed.
b.
On Functional
Needs/Desires/Wants
section
i.
Check
Must Haves
ii.
Prioritize
Must Haves into top 10 (Vendors will be asked to incorporate these into demos)
3.
Departments
identify best time of year to migrate to new system
1-2
representatives per department per institution
Participants
will meet with colleagues in the following department clusters:
(Note
list may be modified for later sessions based on vendor package structure)
Sessions
will be scheduled on the same day (several in the morning and remainder in the
afternoon) in the same place and led by members of the CIO/ Dir Admin IT group.
(To demonstrate collaboration, the two leaders will be from different
colleges.)
The
agenda should include:
1.
Introduce
the staffs to each other (have directory prepared for handout)
2.
Get
everyone on the same page as to:
a.
Why we
are doing this
b.
Operating
assumptions including:
i. Standardized business processes
ii. Willingness to change
iii. Reluctance to customize
3.
Reports
on the homework assignment
4.
Summarization
of high priority department specific demo requirements
5.
Review
of Business Process Flows (see Attachment E)
6.
Obtain
volunteers for work groups to develop business process flow scenarios