![]() ![]() |
1. & 2. Portable Sign with Replaceable Panel for ECO House 3. 1.25mm x 2mm Integrated Circuit to 8-Pin DIP Header Adapter for Student Audio Synthesizer Project |
![]() |
1. Stereo Fm Transmitter for "Silent" Student Dances. 2. Custom Faucet Aerator Installation/Removal Tool 3. & 4. Wheelbarrow-Accessible Stand for Composter at ECO House . |
![]() ![]() ![]() ![]() |
1. Doty-Turck "Fish Bowl" Green Roof Installed, with MacCARE's Students 2. Rain Runoff Measurement Barrel & NIST Traceable Rain Simulation Bucket 3. Students take Timed Readings with Simulated Rain 4. And the "Real Thing". |
![]() ![]() ![]()
|
1. Roof Drain Runoff Measurement Pumping System 2. Runoff Pumping System Start-Stop Sensors. 3. & 4. Roof Drain Pump Installed on Kagin Hall... Green Roof Section. |
![]() ![]() ![]() ![]() |
1. Roof Drain Pump Installed on Non-Green Roof Section. 2. Measurement Barrels for Non-Green Roof Section. 3. Measurement Barrels for both Roof Sections. 4. Alese Colehour, Student, MacCARE's Green Roof Task Force . |
|
1. 12V/17A Pump Power Supply for Kagin Green Roof |