1. & 2. Portable Sign with Replaceable Panel for ECO House

3. 1.25mm x 2mm Integrated Circuit to 8-Pin DIP Header Adapter for Student Audio Synthesizer Project
1. Stereo Fm Transmitter for "Silent" Student Dances.

2. Custom Faucet Aerator  Installation/Removal Tool

3. & 4. Wheelbarrow-Accessible Stand for Composter at ECO House .

1. Doty-Turck "Fish Bowl" Green Roof Installed, with MacCARE's Students

2. Rain Runoff  Measurement Barrel & NIST Traceable Rain Simulation Bucket

3. Students take Timed Readings with Simulated Rain

4. And the "Real Thing".
1.  Roof Drain Runoff Measurement Pumping System

2. Runoff Pumping System Start-Stop Sensors.

3. & 4. Roof Drain Pump Installed on Kagin Hall... Green Roof Section.


1. Roof Drain Pump Installed on Non-Green Roof Section.

2. Measurement Barrels for Non-Green Roof Section.

3. Measurement Barrels for both Roof Sections.

4. Alese Colehour, Student, MacCARE's Green Roof Task Force .
1. 12V/17A Pump Power Supply for Kagin Green Roof